If it makes medicine, we build the machine.

From granulation to the carton, our machines cover every step of a solid and liquid oral line. Built in Ahmedabad, installed and serviced by our own engineers.

Call one number. An engineer who knows your machine answers.

Ask for a quote
+91 00000 00000

Monday to Saturday, 8:00 to 20:00

A person picks up within two minutes. Tell us the machine number on the plate and they open its full history.

Who answers

One of our twelve service engineers, each of whom has installed machines like yours and carries the common spares.

Out of hours

Machine alarms on our remote panel reach the engineer on call, at night and on Sundays. Or write to service@prakashmachines.example.

Two hundred plants run our machines. Here are five of them.

From a new tablet plant in Baddi to an export unit in Hyderabad, the same machines and the same service.

  • A medicine plant from the outside

    Aditya LifesciencesTablets and capsules, ChangodarA full solid oral line, installed in eleven weeks.

  • An operator running a machine on the shop floor

    Himgiri PharmaTablets, BaddiTwo double rotary presses, output up thirty per cent.

  • Granules ready for compression

    Sanjivani RemediesGranulation, IndoreDrying time cut from three hours to fifty minutes.

  • A packing machine on the line

    Deccan FormulationsExport unit, HyderabadAlu-Alu blister line passed the buyer's audit first time.

  • A finished goods store

    Narmada HealthcareSyrups, VadodaraA liquid line filling 120 bottles a minute.

Built for audits, without the headache.

Most audit observations on machines come from missing papers, not missing quality. Every machine leaves with its papers ready.

Ask for a sample file
  • SS 316L contact parts

    Polished to a mirror finish, with the material certificate in the file.

  • Validation documents

    Design, installation and operation qualification papers, filled in with you at site.

  • Easy cleaning

    Parts that come off without tools and drain fully, for quick changeovers.

  • Safety interlocks

    Guards that stop the machine the moment a door opens.

  • Spare parts list

    Every wear part listed with its code, and the common ones kept in our store.

One price per machine. Everything in it.

  • Breakdown calls and visits, as many as it takes
  • Two preventive visits a year per machine
  • Labour for every repair, spares at list price
  • Remote panel monitoring where fitted
  • A service report after every visit
6

₹8,000 per machine, per month

₹48,000 a monthYearly contract, cancel with 60 days' notice. GST extra.

Ask for a quote

What changed after the first month.

Three plants, asked what they used to put up with. Their answers, before and after.

  1. Himgiri Pharma

    Tablet plant in Baddi, with us since 2021

    BeforeThe old press stopped twice a shift, and spares took a week to come.

    Down time cut to two short stops a month, spares delivered in a day.

  2. Sanjivani Remedies

    Granulation block in Indore, with us since 2022

    BeforeDrying took three hours a batch and the bags tore every month.

    Fifty-minute drying and new bags only twice a year.

  3. Deccan Formulations

    Export unit in Hyderabad, with us since 2023

    BeforeThe blister machine's papers were incomplete before every audit.

    A complete validation file, and the audit passed without a machine observation.

Twelve engineers. You will know them by name.

Nobody here works from a script. Each engineer looks after the same plants, so they know your machines and your people.

  1. Kirit Mehta in a hard hat

    Kirit Mehta

    Founder. Still designs every new machine himself.

  2. Ritu Shah at her desk

    Ritu Shah

    Service head. Plans every visit and every spare.

  3. Sandeep Yadav checking a line

    Sandeep Yadav

    Senior engineer, tablet presses.

  4. Arjun Solanki at work in the workshop

    Arjun Solanki

    Workshop lead. Builds the change parts.

  5. An automated line in our assembly hall

    Assembly hall

    Where every machine is run for a day before it ships.

Questions plants ask before they call.

Something else on your mind? Ask our engineer on the first visit; there are no silly questions.

How long does a new machine take?

Eight to fourteen weeks from the approved drawing, depending on the machine.

What if a machine stops at night?

Call the service number. The engineer on call answers and talks your team through it, or comes in.

Do you service other makers' machines?

Yes, for most common makes, once our engineer has seen the machine.

Do you give a factory trial?

Yes. Every machine runs your product in our hall before it ships, and you are welcome to watch.

Do you export?

Yes, with installation by our engineers or a trained local partner.

Ask for a quote.

Tell us the product and the output you need. An engineer calls you back and, if you like, visits your plant.

Visit
Plot 112, Phase IV, GIDC Vatva, Ahmedabad 382445
Hours
Monday to Saturday, 8:00 to 20:00; machine alarms on call around the clock.

Demo design. The business, people and numbers are examples; yours replace them. All designs Ask for early access